SITE PROGRESS

APRIL 2019

View of D’Rapport Residences

Site-Inspection

Site Inspection by Acmar’s management with the project consultants

bird-eye-view

Bird’s eye view of Block D (Roof Fins in progress) & Block E (Penthouse)

View-of-Block-C-(Auston)

View of Block C (Auston)

Glass-Wall

Construction of “Glass Wall” Pool at Block B (Swinton)

block-B

View of Block B (Swinton)

entrance

Type A, B & C Entrance Featured with Back -Lit Lights

OCTOBER 2018

Morning Briefing

Visit CREC Office

D’Rapport Residences Façade

Retail Shop Lots

Checking Electrical Conduit

Wall Plastering

Completing Initial Interior Work

Checking Installed Formwork

Installing Formwork

Steel Bars Inspection

Preparation for concreting

Concreting in the Night